Cowichan Watershed Board

  • Email
  • Facebook
  • RSS
  • YouTube
MENUMENU
  • About
    • Indigenous Co-governance
    • Our Principles
    • Board Members
    • Staff Team
    • Non-Profit Society
    • Supporters (Coming Soon)
    • Contact Us
  • Targets
    • Water Quality
    • Estuary Health
    • Salmon Sustainability
    • Wise Water Use
    • Watershed IQ
    • Water Flows
    • Riparian Plants
    • Target Working Groups
  • Projects
    • River Cleanup
    • Koksilah
    • Twinned Watersheds Project
      • Riparian Plants
      • Indigenous Flows
      • Fish Habitats
      • Big Dancing Fish
    • Weir Ready
      • Weir Ready FAQ
    • Speakers Series
    • Past Projects (Coming Soon)
      • Water Challenge (Coming Soon)
      • Superheroes (Coming Soon)
  • Library
    • Board Meetings
    • Governance Documents
    • Maps
    • Media
    • Presentations
    • Videos
    • Reports
      • CWB Reports
      • Other Reports
    • All Library Items
  • Latest News
You are here: Home / content / The Cowichan Lake Weir

The Cowichan Lake Weir

October 4, 2010 by Jill Thompson

CowichanLakeWeir-labelledThe weir on Cowichan Lake is used to control the outflow from the lake into the Cowichan River during the spring-fall season. For much of the time between late fall and late spring each year, it does nothing, and the weir is referred to as “off control” since the lake level is above the top of the weir. 

WeirControlGatesIn recent decades, management of the weir has required challenging judgement calls in which the lake level, discharge rate in the river, salmon priorities, and rainfall predictions are all factors which must be juggled.

In 2019, the lake fell below “zero storage” and electric pumps were required to pump water out of the lake and into the river to keep the Cowichan River flowing, prompting comparisons to this important heritage river being on life support. 

 Physically, the weir is roughly 1 metre tall. It was built in 1957 and is managed by Catalyst Paper, owners of the Crofton Mill.

For more information, visit WeirReady.ca

For updates on work to replace the weir with a higher model to mitigate the changing climate, visit Cowichan Water Use Plan


Related Resources

Cowichan Weir Operating Guidelines
Michelle Vessey et al, Catalyst Paper, October 2008

Cowichan Lake Water Management Rule Curve & Rule Band
Craig Sutherland, Presentation, January 2011

Cowichan Lake Weir Operation – Rule Curve & Rule Band
Craig Sutherland, Report, January 2011

Filed Under: content

Click image for more information

2023 RiverCleanup Poster

Click for more information

Click image for Board Meeting Agenda Packages

2023 CWB Members

2023 Cowichan Watershed Board members. Click image for Board Meeting Agenda Packages

Cowichan Lake Weir Updates (Click image)

Final Design Concept image

Cowichan Lake Weir Updates (Click image)

Why Fish Need Water

Latest News

  • Changing Conditions Force Difficult Decisions for Managing Cowichan River
  • Workers to pump water into Cowichan River amid drought
  • CBC Radio – On The Island Interview with Tom Rutherford -Cowichan River water levels.
  • Prolonged drought, low flows behind mass fish kill on Cowichan River, says DFO

Sign up for E-News!

Board Meeting Notifications

Event Notifications

CWB Website

Home
About Us
Contact
Cowichan Basin Water Management Plan
Documents & Presentations
Privacy
Terms

Targets

Water Quality
Estuarine Health
Salmon Sustainability
Water Use
Watershed IQ
Water Supply
Riparian Area Protection

Cowichan Watershed

Introduction
Cowichan Lake
Quamichan & Somenos Lakes
Cowichan Estuary
The Weir

Logo Email

info@cowichanwatershedboard.ca

Mailing Address
4335 Riverside Road
Duncan, BC, V9L 6M8

Copyright © 2023 Cowichan Watershed Board - All Rights Reserved. | Design by MAC5

sponsor logo
The Cowichan Watershed Board (CWB) gratefully acknowledges the financial support of the above organizations.